FRAGRANCE BUYER Q&A
What is the difference between EXW, FOB, CIF and DDP for perfume orders?
Quick Answer
EXW: goods available at the named place, not loaded. FOB: seller delivers aboard at the shipment port; buyer arranges main carriage. CIF: seller pays freight/minimum insurance to the destination port, while risk transfers aboard at shipment. DDP: import-cleared delivery at the named destination, ready for unloading. FOB/CIF are sea or inland-waterway terms. Confirm the agreed rule, place, route and legal responsibilities in the project quote.
Detailed Answer
Incoterms® 2020 rules allocate delivery, risk and specified transport, customs and cost responsibilities between seller and buyer. Agree the rule, named place or port and edition in the contract.
EXW (Ex Works): the seller makes the goods available at the agreed named place, which may be a factory, without loading the collecting vehicle. The buyer handles collection, carriage and applicable export/import formalities.
FOB (Free On Board): the seller export-clears and delivers the goods aboard the vessel at the named shipment port, where risk transfers. The buyer arranges main carriage; FOB does not itself require the buyer to purchase insurance.
CIF (Cost, Insurance and Freight): the seller pays freight and the required minimum insurance to the named destination port, but risk transfers when the goods are placed aboard at the shipment port.
DDP (Delivered Duty Paid): the seller delivers import-cleared goods on the arriving means of transport at the named destination, ready for unloading, and bears the applicable import duties and taxes. Confirm that the seller can legally fulfil those clearance and tax obligations.
FOB and CIF are for sea or inland-waterway transport; EXW and DDP can be used for any mode. For container or multimodal shipments, review FCA, CPT or CIP as appropriate rather than automatically choosing FOB or CIF.
For perfume orders, alcohol-based flammable liquids and destination-specific labeling, registration, or carrier restrictions affect how these terms are applied, so the practical quote must be confirmed for the exact product, pack size, and destination.
Available delivery terms must be confirmed in the project quotation after review of the exact route and responsibilities. Duties, taxes and clearance responsibilities are not agreed before the destination and legal arrangements are checked.
Please submit an inquiry with your target market, Incoterm preference, and shipping address so we can confirm the correct responsibilities and quote structure.
For comparison, use the official ICC Incoterms® 2020 overview chart (PDF) and ICC selection checklist (PDF). These resources support selection and do not replace the full rules or confirm which terms LAEYO can offer for a destination.
